Note: this feature is no longer supported in SLIM-Collaborate 3.2 and above. A solution status change was a predefined transition from a specified starting status to a specified end status. For each status change defined, an external call could be triggered to send information about the project to an external application. Starting with SLIM-Collaborate 3.2, external calls are launched manually via a special icon on the project toolbar of projects in the estimation or closeout stage. They are no longer part of the external call’s settings.