QSM reference trends are provided for the following metric pairs. Note that not all metric pairs are available in every service:
|
Independent Metric |
Dependent Metric |
|
Effective IU |
PI |
|
Effective IU |
Average Construction Rate (Effective IU per Phase 3 month) |
|
Effective IU |
Productivity (Effective IU per Phase 3 Phr) |
|
Effective IU |
Phase 3 Effort (Phrs) or Total Lifecycle Effort |
|
Effective IU |
Phase 3 Duration or Total Lifecycle Duration |
|
Effective IU |
Phase 3 Average Staff or Total Lifecycle Average Staff |
|
Effective IU |
Defects (SIT-DEL) |
|
Effective IU |
MTTD |