Phase Tuning Override

The Phase Tuning Override setting (Estimation stage projects only) allows estimators to override the project’s phase tuning configuration settings and apply phase tuning statistics from the project’s current benchmark trend group instead. if Phase 4 is active, the Phase 4 tuning will still use the project configuration set tuning even if the override checkbox is checked.  The trend tuning values override only applies to Phase 1, Phase 2, and Phase 3 tuning factors. See also: Configuration Sets, Phase configuration sets, and Phase Tuning.